This test case is used for validating the components of an EPC or an eNB for a valid attach procedure.
In this test case, ABot can simulate the eNB and UE and any other node of the 4G EPC like MME, SGW, PDN-GW, HSS and PCRF. The eNB and UE sends an Initial Attach request message with a valid IMSI value. The eNB and UE receives an Attach Accept message, in an ideal case. Now, eNodeB to send a UE Context Release Request to the MME for S1 release procedure
The procedures completed in this test case are –
- Diameter Capabilities Exchange
- S1-Setup
- Initial UE Message
- Authentication Information Retrieval
- Authentication procedure(AKA)
- Tunnel Management
- IP CAN Session
- S1 release procedure
This test case is executed as per 3GPP TS 23.401
Protocol Used | Nodes Involved | Interfaces Involved |
---|---|---|
S1AP, Diameter, GTPv2C, NAS | MME, eNodeB, SGW, PGW, HSS, PCRF | S1-MME, S11, Gx, S5/S8, S6a |