SN initiated SN Modification with MN involvement

The Secondary Node Modification procedure may be initiated by the SN. The SN uses the procedure to perform configuration changes of the SCG within the same SN, e.g. to trigger the release of SCG bearer(s) and the SCG RLC bearer of split bearer(s) (upon which the MN may release the bearer or maintain current bearer type or reconfigure it to an MCG bearer, either MN terminated or SN terminated), and to trigger PSCell change.

Register to continue

Create an account and get all our ABot Resources for FREE.

Already a member ? Login